You can always tell these young men of the steam-hammer or rolling mills, whenever you meet them. They are usually lank and thin and their faces are ghastly white. Their nostrils are distended; black and blue rings encircle their eyes. Their gait is careless and shuffling, and their dress, on a holiday, is a curious mixture of the rural and urban styles. On week-days they are as black as sweeps, and the blacker they are the better, in their opinion, for they take pride in parading the badge of their profession and are not ashamed of it as are their workmates who dwell in the town.

I have said that formerly much more iron was manufactured on the premises than is the case at this time. Then the steam-hammer shed, in which nothing but forging is done, was a flourishing place. All the wheels for the engines and waggons, together with piston rods, driving gear, axles, and cranks, were made there. These are obtained elsewhere now, some in England and Scotland, and other parts from abroad. Steel has superseded iron in a great degree, too, being harder, tougher, stronger and cheaper. The combined skill of the chemist and scientist has simplified the manufacture of it, and it is to be obtained in large quantities. But steel rusts much more quickly than iron, and does not last nearly as long in exposed positions on the vehicles.

Life in a Railway Factory — Part 16

Formerly all wheels were made of wrought iron and a great part of the work was done by hand. First of all the sections were made under the steam-hammer, in “=T=” pieces and boss ends, and shut in the middle. These were for the spokes. Then the “=T=” ends were incurved and joined together all round till the rim of the wheel was finished. After that, there remained to form the centre and make the “boss” solid and compact. As the boss sections were made to fit together in the middle, they only required to be heated and welded. Accordingly they were placed on an open forge, built round with damp coal-dust to contain and concentrate the heat, the boss being exactly over the centre of the fire. Another forge, close at hand, contained a large round iron washer, similarly placed, to which was attached an iron bar for lifting it from the fire. Both heats were prepared simultaneously. Then the wheel, lifted by a crane, was quickly removed from the forge, turned upside down and placed on the steam-hammer block. The washer was brought out at once and clapped on smartly, and down came the heavy monkey. Half-a-dozen blows were sufficient to make the weld. Then it was removed from the steam-hammer and laid on an iron table and the smiths set about it with their tools to finish it off, three or four men striking alternately on one “flatter” or “fuller,” with perfect rhythm and precision, the chief smith directing operations and working with the rest.

Life in a Railway Factory — Part 16