THE return of peace in 1865 found the country without sea-commerce either coastwise or foreign. Such ships as had not been taken up by the government had, with the exception of a few whaling-vessels in the Pacific Ocean, been transferred to foreign flags to save them from the ravages of Confederate pirates or cruisers which, to all intents and purposes, so far as construction, armament, equipment, and crews were concerned, were nothing but British privateers in disguise. In the mean time England had taken every advantage of the situation, and by 1865 had practically absorbed all the magnificent ocean-carrying trade which the United States enjoyed prior to 1860. American ship-building was at a stand-still. The government at once threw upon the market all the ships which it had taken up for gun-boats, auxiliary cruisers, transports, etc., during the war. They were sold for anything that they would bring, and they were bought up as a speculation by new companies unfamiliar with the shipping business, and as a consequence they all failed. The ships were obsolete or worn out and soon passed out of existence. Certain coastwise lines continued to do a small business, but little or no attempt was made to restore our foreign trade; first, because none of the vessels which the government threw on the market were in a condition to undertake it; and, second, because, in consequence of the inflated prices of everything, any attempt to compete either in seafaring labor or material with England would have been absurd. Besides this, the whole energy and capital of the country were immediately directed to an extraordinary expansion of railway systems, so that the attention of the people was entirely diverted from the sea and fixed upon the interior. For the next five or six years little or no ship-building of any description was done anywhere in the United States.
It was at this time that the Cramp Company considered it indispensable to attach engine building to the construction of hulls, as no satisfactory arrangement could be made to secure accurate performance that involved two independent and diverse handicrafts in the undertaking. They secured the services as engineer of Mr. J. Shields Wilson, whose training in the I. P. Morris Company, and at Neafie & Levy’s works had demonstrated his fitness for the post, and as to whose methods they were familiar.






