The Gilmore and Pittsburgh Railroad (G&P), now defunct, was an American railroad located in southwestern Montana and east-central Idaho. Constructed in 1909 and 1910 between Armstead, Montana, and Salmon, Idaho, the G&P served mining and agricultural areas in Lemhi County, Idaho, and Beaverhead County, Montana. The line was financially backed by the Northern Pacific Railway (NP) and later became its subsidiary. Never financially successful, the G&P ceased operations in 1939, and the railroad was dismantled the following year.
Planning and construction
During the first decade of the 20th century, Lemhi County, in the remote Salmon River country of central Idaho, was seeing both increased agricultural development and substantial, renewed mining activity. At that time, the area was part of one of the largest contiguous blocks of land not served by a railroad and, consequently, there was significant interest in the prospect of building a railway line to serve the region. The desire for a railroad was perhaps most strongly felt by those promoting the county's mining developments, although a variety of existing railway companies also studied the prospects of the area. The NP gave Lemhi County particular attention, envisioning a new transcontinental route that would veer southward from their existing lines in Montana, cross into Idaho via Bannock Pass, and follow the rugged Salmon River canyon westward across the state.
These dreams began manifesting in 1907 when a group of Pennsylvania businessmen led by W. A. McCutcheon incorporated the Gilmore and Pittsburgh Railroad. McCutcheon envisioned a railroad running westward from a connection with the Oregon Short Line Railroad at Armstead, Montana. The line would enter Lemhi County via Bannock Pass, and continue to the Lemhi River valley. In the valley, branch lines would run upstream to the promising mining camp of Gilmore, and downstream to the county seat of Salmon. Soon, McCutcheon was able to interest NP officials in his plan, since a completed G&P could form a basis for a future NP line down the Salmon River. The NP assisted in the initial survey of the G&P route, and later agreed to financially and materially support the G&P's construction.
A contract for construction of the G&P grade was awarded in March 1909, and work began in earnest the following month. Construction was pursued in earnest throughout the following year, working west from Armstead, and the tracklayers reached Salmon on April 25, 1910. The completed line was in length, and was largely built to the mainline standards of the NP. A golden spike celebration was held in Salmon that May 18, even though portions of the line—including the tunnel under Bannock Pass—were still being completed. Regular passenger and freight service on the G&P began soon thereafter.
Optimism and rumors concerning further expansion of the G&P persisted through 1910. McCutcheon had promised that the line would be extended northward from Armstead to Dillon, Montana that year, the first step in completing a connection to the NP's trackage at nearby Twin Bridges. No further construction took place, however, in part due to G&P legal difficulties in securing right-of-way between Armstead and Dillon. Simultaneously, though, the NP began to realize the engineering difficulties and limited economic potential of its proposed Salmon River route, and local G&P officials began to discover that the local traffic potential was actually far less than anticipated. Consequently, the hopes for future expansion of the G&P soon faded, and the line was never extended beyond either Armstead or Salmon.
Route
The route of the G&P was remote, thinly populated, and often rugged. The line began at the small hamlet of Armstead, Montana, a station stop on the Oregon Short Line Railroad's route between Idaho Falls, Idaho and Butte, Montana. (The Oregon Short Line was a long-time subsidiary of the Union Pacific Railroad, and was later absorbed into that system.) Armstead was in a high valley of the Beaverhead River, in a region known for livestock grazing. The G&P maintained a small yard there, and it was the site of the railroad's corporate office.
From Armsted, the railway headed almost due west, traversing a thinly-populated ranching region known as Horse Prairie. The area provided additional livestock traffic for the railroad, and there were mines in the nearby mountains. Substantial areas of cut and fill were required as the railroad ascended the prairie. The railroad curved southward near the western end of Horse Prairie. and began its ascent of Bannock Pass.