The South Metropolitan Electric Light and Power Company Limited was a British electricity undertaking. It was established in 1904 upon the amalgamation of two south London companies which had supplied electricity in south east London since 1893. It owned and operated a power station at Blackwell Point and one at Penge. From 1925 it formed an association with three other London companies, with the intention of centralising electricity generation in the new, high thermal efficiency, power station at Barking. The South Metropolitan Company was abolished in March 1948 upon the nationalisation of the British electricity supply industry.

Background

The South Metropolitan Electric Light and Power Company Limited took over the interests of several early south London electricity supply companies.

South Metropolitan Electric Light and Power Company

The Electric Construction and Maintenance Company was registered on 30 June 1883. The name was changed to the Electric Installation and Maintenance Company on 2 December 1889, and then to the Crystal Palace District Electric Supply Company on 19 December 1891. A Provisional Order to supply electricity was granted by the Board of Trade in 1890. The Crystal Palace District Company supplied electricity to parts of the districts Camberwell, Lambeth, Lewisham, Croydon, Beckenham and Penge from February 1893.

South Metropolitan Electric Light and Power Company

The Blackheath and Greenwich District Electric Light Company Limited was registered on 11 May 1896. A Provisional Order was granted by the Board of Trade in 1897 to supply electricity to Greenwich, Charlton, Eltham, Lee, Kidbrook, and Lewisham. The local authorities had the right to purchase the part of the undertaking within its district at a premium of 33 per cent above the capital expended. Electricity supplies started from Blackwall Point power station in 1900.

South Metropolitan Electric Light and Power Company

On 16 June 1904 the Crystal Palace District undertaking was taken over by the Blackheath and Greenwich District Electric Light Company Limited. Following the take-over the combined undertaking was known as the South Metropolitan Electric Light and Power Company Limited. The Company’s supply area comprised the Metropolitan Boroughs of Lewisham and Greenwich except the parish of St Nicholas Deptford, the Urban District of Penge, a small part of the south of the Metropolitan Borough of Lambeth, and a small part of the south of the Metropolitan Borough of Camberwell. The Company was authorised to supply current to small areas in the Croydon County Borough and the Beckenham and Penge Urban Districts.

Operations

Management Board

The management board of the South Metropolitan Company in 1909 comprised:

Henry St John Winkworth (Chairman) William May Henry White Bowden (Managing Director)

The company offices were at 183-185 High Street Lewisham.

In 1936–38 the board was composed of:

Sir Bernard Greenwell (Chairman) M. B. U. Dewar Sir Robert Renwick

The company offices were at County House, 46/47 New Broad Street, London EC2.

Power stations

The Crystal Palace District generating works was known as the Springfield Works, and was located in Springfield Road, Sydenham. The works were opened in 1893 and closed about 1904–10.

Penge power station also supplied electricity to the South Metropolitan Company system.

The Blackheath and Greenwich Company build a power station at Blackwall Point on the site of the East Greenwich tide mill. It opened in February 1900.

In 1923 the plant at Blackwall Point comprised:

Boilers: Coal fired boilers producing 371,000 lb/h (46.7 kg/s/) of steam which supplied: Generators: 2 × 1,500 kW turbo-alternator, alternating current, 1 × 2,500 kW turbo-alternator, alternating current, 3 × 5,000 kW turbo-alternator, alternating current,

These machines had a total generating capacity of 20,000 kW.

The electricity available to customers was:

2-phase AC 50 Hz, or 3-phase AC 50 Hz, at 400, 200 and 100 Volts.

Operational data

The amount of electricity load for the Crystal Palace District undertaking was as follows:

The amount of electricity and number of customers of the Blackheath and Greenwich District operations 1900–03 was as follows.

Both data tables demonstrate the rapid increase in electricity demand for electricity during this period. Comparative data for the Blackheath and Crystal Palace undertakings in 1903 was as follows.

The data demonstrates that the Crystal Palace undertaking was about half the size of the Blackheath and Greenwich undertaking.