The Canning Dam and reservoir are a major source of fresh water for the city of Perth, Western Australia. The dam is situated on the Darling Scarp and is an impoundment of the Canning River. It is noted for its innovative structural and hydraulic design that was considered to be at the forefront of concrete gravity dam design at the time of construction in from 1933 to its completion 1940.

The Canning Dam was Perth's primary water supply up until the 1961 when other sources of fresh water were tapped, such as the Serpentine dam. Currently the dam supplies approximately 20 percent of Perth's fresh water. Inflow into the Canning Reservoir is estimated to be , and it has a storage capacity of .

Canning Dam

Since its completion in 1940, the Canning Dam has contributed to a wide range of environmental and ecological problems in surrounding regions, problems include more common algal blooms, habitat loss and sedimentation. Despite these issues, Canning Dam and the adjacent parks and forests provide a variety of recreational activities for the public such as bushwalking, historic walks and picnic facilities.

Canning Dam

History

Development of the Canning River as a source of water for Perth was first proposed in a report of the first Metropolitan Water Works Board of Perth in 1896. Investigation of the site began in 1897 when engineer Thomas Hodgson surveyed and proposed the dam's current location as a possible site. However, despite the recommendations of further inquiries, and an extreme shortage of water in some years, government funds were not allocated for the construction of a dam until the Great Depression in the 1930s.

Canning Dam

In 1924 a small pipehead dam was built downstream from the present Canning Dam. It was intended as only a quick fix to the water supply problem and it soon became apparent that a major reservoir was needed, although it was nine years before work on the current Canning Dam began. The new dam was completed in 1940 at a cost of AU£1.1 million. Engineer Russell Dumas designed the dam and directed most of its construction.

A further improvement was made in 1951 when a concrete-lined channel was constructed to divert stream flow from the nearby Kangaroo Gully catchment. The Canning Dam and reservoir was Perth's primary source of water until the boom growth of the city in the 1960s and the completion of Serpentine Dam in 1961. In 1975 the reservoir was connected to Perth's Integrated Water Supply System by the Canning Tunnel. Prior to its opening water had flowed through the Canning Contour Channel to Gosnells.

The Canning Dam and reservoir still supplies approximately 20 percent of Perth's drinking water requirements and plays an important role in the context of the development of Perth.

The Canning reservoir is also used to store water from Kwinana Desalination Plant. Treated water can be pumped from the plant to the reservoir through the Forrestdale Pumping Station.

Hydrology

The Canning Dam Catchment lies within the Darling Scarp which forms part of an Archaean Shield composed largely of granite with some invaded linear belts of metamorphosed sedimentary and volcanic rocks.

The dam wall is situated in a narrow gorge running east and west, with rock sides sloping upward from the river bed. Behind the dam wall, the south branch of the Canning River joins the main stream, with the impounded water forming a lake which stretches back in three major arms to the east south-east and south.

The catchment has an area of . The reservoir is at AHD and the highest point of the catchment, Mount Cooke is at AHD.

Climatically, the area receives about of rainfall per annum with most of this falling between May and September. There is a large variability of rainfall across the catchment however, from between .

Since 1975 long-term average rainfalls at the dam wall have decreased by 20 percent and streamflow into the catchment by approximately 60 percent—the average annual inflow between 1948 and 1974 was which had reduced to between 1975 and 2004.

Construction

The construction of Canning Dam ended a long period during which Perth's water supply was generally unsatisfactory in quality (either due to salinity or bacterial pollution or both) and in quantity. The project, the biggest public works program of the decade, stimulated significant growth in the local economy and provided desperately needed work for around five hundred men.

Several innovative design concepts and construction methods which were new to Australia were introduced on the project, while others which were used on the nearby Wellington Dam, were improved upon at the Canning dam site.