A highly controversial big-budget rivers project in South Korea has again enraged the Korean public with the release of an audit report revealing that the country's ex-president and the ruling party allegedly went back on their word about dropping additional canal construction. The government claims that the main purpose of the ‘Four Major Rivers Project’ is to prevent floods and create new jobs, but civic and environmental groups have strongly protested against the project since its very early stage, stressing that it will cause irreversible harm to the environment by blocking water flow and meddling with the ecosystem. A previous audit report released in January 2013 revealed that construction was a poorly done train-wreck. One of the most contested parts in the project was for canal construction, a costly plan which was considered not only unnecessary, but seriously detrimental to the environment. As public opposition grew stronger back in 2010, then-president Lee Myung-bak and the ruling Saenuri party backed off from their initial plan and vowed repeatedly that [ko] they will, at least, drop the canal plan. However, the latest report by the Board of Audit and Inspection exposed that the Four Major Rivers project laid physical groundwork for canal construction. Image of Four Major Rivers Construction Site, South Korea. Image by Flickr user @Wetlands and Birds Korea (CC BY-NC-ND 2.0) On July 15, 2013, the United Progressive party filed a lawsuit [ko] against Lee Myung-bak and his close inner circle members under the charge of negligence of duty, dereliction of duty and abuse of authority, condemning them for having ‘deceived Korean people, wasted the 22 trillion Korean won (about 20 billion US dollars) of taxpayers’ money, and abused government power for personal gain’. Prominent citizen journalist Media Mongu (@mediamongu) tweeted [ko] a photo of protesters in front of Lee Myung-bak’s house. It has been retweeted more than 180 times. @mediamongu: 4대강 사업은 변종 대운하였으며, 국민을 상대로 한 22조원 짜리 거대 사기극이었음이 만천하에 드러났습니다. MB 자택 앞에서 철저한 수사와 처벌을 요구하고 있습니다 pic.twitter.com/wufJI5YKB6 @mediamongu: The Four Major Rivers Project turns out to be a mutant for the canal [project] and 22 trillion Korean won (about 20 billion US dollars) of colossal fraud committed against Korean public. People demand a thorough investigation and punishment of [those involved, by protesting] in front of Lee Myung-bak’s house. pic.twitter.com/wufJI5YKB6 Net user ID Nabio on the Daum Agora site listed numerous problems [ko] of this river project, let alone the already done construction works to build canals: Image of Upstream River in Daegu city, South Korea, taken on August 10, 2012 by Flickr User @Friends of Wetlands and Birds Korea (CC BY-NC-ND 2.0) 결국 MB가 떠난 후에도 4대강은 골치덩어리 입니다. 심각한 예산 낭비는 말할 것도 없고 수질은 개악이 되어 심각한 녹조에 의한 녹차라떼를 퍼 먹을 수 있게 되었습니다. 또한 […] 소중한 문화재로서 가치가 있을 법한 것들도 충분한 제고 없이 4대강 공사에 파묻혀 버렸다는 것입니다. […] 4대강 사업은 처음부터 많은 문제점을 가지고 있었습니다. 물을 관리한다는 것은 좋은 것입니다. 하지만 3면이 바다인 나라에서 내륙에 운하를 만들고 배를 띄운다는 것은 쉽게 이해할 수 없는 일이었습니다. 그리고 잘 흐르는 강을 인위적으로 막아 ‘호수'를 만드는 것 또한 물을 다스리는 것이 아니라 자연의 법칙을 거스르는 짓이었습니다. Even after MB [ex-President’s initial] had gone, the Four Major Rivers Project still remains as a pain in the neck. Not only has it hemorrhaged the national budget, but it has deteriorated the water quality that now we are able to drink the algae green tea latte straight from the river. [note: green tea latte is a sarcastic nickname people call river water turned green due to mass algae outbreaks]. Also cultural artifacts [unearthed in the construction sites] have been tossed back [so not to hinder/delay] the project.[…] The Four Major Project Project is inherently problematic. Although there is nothing wrong with controlling the water, the idea of building canals to promote water transportation in a country (peninsula) whose three sides are all surrounded by water is hard to buy. Building lakes artificially by blocking the water flow is not the way of controlling water [as they've told public], but is an action taken against the laws of nature. Prominent political blogger Impeter, who has been closely following the story for years, wrote another explainer [ko] summarizing the audit and inspection report and reminding people of media censorship that blocked an investigative report from airing. The blogger, later in the post, voiced worries that this issue can be used to divert the public's attention from the recent spy agency scandal: 여기에는 이명박 전 대통령이 대운하를 하지 않겠다고 해놓고 “사회적 여건 변화에 따라 운하가 재추진될 수도 있으니 이에 대한 대비가 필요하다”는 MB의 지시에 따라 대운하 재추진과 연계된 4대강 사업 계획을 수립했고, 2.5m만 준설해도 되는 수심을 6m가 되도록 지시했다는 내용도 포함됐습니다. 감사원의 이런 지적은 밝혀져야 할 진실이 이제야 드러난 것에 불과합니다. 이미 PD수첩은 <4대강,수심 6m의 비밀>이라는 방송에서 이와 같은 내용을 폭로한 적이 있었기 때문입니다.