This article shows the notable future developments in Singapore. Most of them are currently under construction with most to be completed within the next five years.
Commercial
Central Boulevard Towers
Scheduled to be completed in 2024, the 99-year leasehold white site at the junction of Central Boulevard and Raffles Quay named Central Boulevard Towers offers premium Grade A office space. The development consists of two office towers (16-storey and 48-storey) above a 7-storey retail podium block and buoyed by an interstitial green landscaped public space. A sky garden on the 7th floor offers a dedicated jogging track and viewing decks, as well as a restaurant.
The project will be directly connected underground to the adjacent Downtown MRT station on the Downtown line, with link bridges to the East West line and North South line at Raffles Place station and Shenton Way station on the Thomson-East Coast line.
Guoco Midtown and Midtown II
Guoco Midtown, a mixed-use development by GuocoLand is currently under construction. Located in the Beach Road area, the S$2.4 billion development will contain a 30-storey office block with flexible spaces, a 33-storey 219-unit residential block named Midtown Bay, and public spaces. It will also be integrated with the conserved Beach Road Police Station, to be fitted with shops. The development is expected to be completed by early 2024.
In addition, with the successful purchase of the site at Tan Quee Lan Street which is located directly above Bugis MRT station and across the Guoco Midtown site, two 30-storey residential towers with more than 500 residential units as well as a public retail podium will be built by GuocoLand. The development will be integrated with the adjacent larger Guoco Midtown and bring about greater connectivity in the area. This land acquisition will result in the combined site area to be 50% more than the existing Guoco Midtown, and is set to become one of the largest developments in the Central Business District (CBD). The project is named Guoco Midtown II, with the residential component named Midtown Modern.
Both developments will be connected underground with the entire development having an extensive pedestrian network to Bugis MRT station as well as the City Hall, Bugis, and Marina Centre districts.
Greater Southern Waterfront
Plans for a southern waterfront city were briefly announced in 2013 as part of a plan to consolidate port activities in Tuas. These plans were elaborated as a Greater Southern Waterfront in 2019, a 2,000ha area with 30 km of coastline from Marina Bay to Pasir Panjang. They include the redevelopment of Keppel Club with 9,000 HDB and private homes. and more office spaces near homes bringing about new ways of living. Links to other nature areas will also be created to places like West Coast Park and East Coast Park, Rail Corridor and Sentosa. In addition, new attractions like the redevelopment of Pasir Panjang power plants, a proposed "Downtown South" resort by NTUC on Pulau Brani to thank workers, revitalisation of Sentosa's beaches, nature and heritage areas on the island too.
On 6 June 2022, the Urban Redevelopment Authority (URA) announced that a 10-kilometer seafront promenade linking Marina Barrage to the Southern Ridges will be built as part of a longer coastal corridor from Marina Barrage to West Coast.
Pasir Panjang Power District
Housing two decommissioned power plants, oil and gas tanks, and ancillary buildings, the Pasir Panjang Power District, located next to the Labrador Nature Reserve, will be redeveloped as part of the Greater Southern Waterfront transformation plans. Some of the proposed ideas include a pair of towers built from old shipping containers, residences, hotels, events venue, gallery space, public park with courtyards, rooftop farms, and a theme park.
The district will be released for redevelopment through a tender in 2021.
Jurong Lake District (JLD)
A new draft masterplan for Jurong Lake District was unveiled on 25 August 2017, with new developments in the Lakeside district. It will include a commercial centre around the High Speed Rail station in Jurong East, as well as a third island crested through a new canal. It would be completed in two decades time, and would be served by the upcoming Jurong Lake District MRT station on the Cross Island Line.