The country between the Jordan and Amman offered many obstacles to our advance. There were the marshes of the Jordan Valley to be crossed, ridges of clay to be surmounted, scrub to be negotiated, followed by an ascent of 3,500 feet. The metalled road to Amman crosses the Jordan at the Ghoraniyeh Bridge, and reaches the hills at Shunet Nimrin. It then winds up a wadi to Es Salt, whence it strikes due eastward to Amman.

The operations commenced in the latter part of March. No serious obstacle was encountered until the crossings of the Jordan were reached. A small party was sent in motor-boats across the Dead Sea to dispose of any enemy who might be in the district to the north-east of the Dead Sea, but they met with few traces of the enemy. The enemy had destroyed the bridge at Ghoraniyeh early in the month. Other means had therefore to be devised for effecting a crossing. "Jordan overfloweth all his banks all the time of harvest." On the 28th March, owing to heavy rain, the river rose 9 feet. Floods had, therefore, to be contended with. The current is at all times rapid, and the banks, on account of the floods, are boggy and difficult for the approach of transport. On the night of the 21st/22nd March, the main crossings of the river were attempted, both at Ghoraniyeh, and a few miles further south at Hajlah, where the Pilgrim Road from Jerusalem reaches the Jordan. At the former point three attempts to swim the river were made, under fire, by men with ropes attached to their bodies, but in each case the swimmers were carried away by the strong current and found it impossible to reach the opposite bank. Then a punt was launched, but this was no sooner launched than it was swept away. The attempt was commenced in the bright moonlight, but was much hampered by enemy fire. It was renewed after the moon had gone down, but then it was impossible to find the easiest route or to negotiate the current in the dark. Farther down stream, however, the efforts met with better fortune. A small party succeeded in swimming across in the dark and landing on the left bank. These towed a rope behind them, by which, after landing, they hauled across light rafts. The crossing by the raft-loads of men had to be carried out in the face of some hostile fire. Portions of the scrub had been set on fire by the enemy, and these fires to some extent lit up the rafts as they were being pulled across. By daylight, 300 men had been got across, and a small bridge-head established. A barrel bridge was without delay constructed by the Engineers. Very little progress could be made that day as the scrub was infested with enemy machine guns. On the following night, however, a rush was made, and the bridge-head enlarged to a width of 1,500 yards. That night the Engineers constructed a steel pontoon bridge, and an entire cavalry regiment was passed over by dawn. The cavalry soon cleared away the enemy, not only from Hajlah, but also from in front of Ghoraniyeh. Bridges were built now at Ghoraniyeh and the passage of the river assured.

With the British Army in The Holy Land — Part 80