The Grayrigg derailment was a fatal railway accident that occurred at approximately 20:15 GMT on 23 February 2007, just to the south of Grayrigg, Cumbria, in the North West England region of the United Kingdom. The accident investigation concluded that the derailment was caused by a faulty set of points (number 2B) on the Down Main running line, controlled from Lambrigg ground frame. The scheduled inspection on 18 February 2007 had not taken place and the faults had gone undetected.
Incident
The 17:30 Virgin West Coast Pendolino West Coast Main Line InterCity service from London Euston to Glasgow Central derailed at 20:15 at a faulty set of points almost immediately after crossing the Docker Viaduct (the rear half of the train would still have been crossing the bridge whilst the front derailed at the points). The train was reported to have been travelling at when it was derailed. The train consisted of unit 390033 City of Glasgow, which was constructed at Washwood Heath, Birmingham, in 2002; formed of a total of nine vehicles. It carried 105 passengers and four crew.
Passengers said that the carriages of the train began rocking and swaying violently as the first coach left the rails. The momentum of the other vehicles caused the front of the second passenger carriage to jack-knife against the back of the first coach, eventually pushing it down the embankment and through 190 degrees, to face in the opposite direction to travel. The resulting forces led to the remaining seven coaches derailing, with all but one coming to rest in the adjacent field. Up to 500 rescuers attended the scene, along with at least 12 ambulances, at least five fire engines, three Royal Air Force Sea King search and rescue helicopters, the International Rescue Corps, three civilian mountain rescue teams plus RAF Leeming Mountain Rescue Team, and one Merseyside Police helicopter. The rescue operation was hindered by rain, darkness, and access problems caused by the narrow country lanes and muddy fields.
Live BBC television coverage at 08:15 the following morning showed that although the whole train had been derailed, the rear carriage was standing nearly upright on the sleepers and ballast. Standard class, the front five carriages, were the worst affected, and the rear four first class carriages were in better condition. The leading carriage, a driving motor coach, had headed down the embankment, and turned end-for-end as it fell. It was lying on its side at the foot of the embankment. The second carriage had jack-knifed against the first, breaking the coupling, and so had not followed it down the bank. This second carriage came to rest some distance further along the track, at a steep angle with one end in the air. The middle part of the train toppled sideways down the embankment, with a total of five carriages turning onto their sides. All the partially friction stir welded carriages remained structurally intact, with damage mainly confined to the crumple zones at their ends. In spite of the severity of the accident, damage to the windows was limited, and all but two of the passengers were contained within the train as it came to rest. The lighting in four vehicles failed during the derailment, leaving them in complete darkness. Most injuries occurred in the front two carriages.
Survivors were initially received at Grayrigg Primary School, which had been opened as a survivor reception centre. Hospitals in the area, including some over the Scottish border in Dumfries and Galloway, were put on standby, but not all received patients. According to BBC News, five passengers were admitted to Royal Preston Hospital in a critical condition. Police later released a statement revealing that one passenger, 84-year-old Margaret Masson from Glasgow, had died in hospital. Her funeral took place on 31 March 2007 at Craigton crematorium in Glasgow. Eighty per cent of the people on the train were injured to some extent, with the principal cause being secondary impacts — hitting (or being hit by) objects, the interior of the train, or other passengers as the carriage impacted the ground or other carriages. Exceptions to this were that one passenger was ejected and one passenger was partially ejected through emergency exit (egress) windows as the carriages came to a stop.
The location of the accident
Aftermath
Within three hours of the derailment the site of the accident had been sealed off with a five-mile cordon. The line was expected to be closed for two weeks, with Virgin Trains saying that the line would not reopen to passenger services until 12 March 2007.